Trees
Anyone interested in planting a windbreak, adding to an existing planting or ordering some hand plants should contact the Lower Niobrara Natural Resources District or your local Natural Resources Conservation Service (NRCS) office.
Trees will be available for the 2012 spring planting season and we will supply you with the information as soon as possible.
Conservation Trees for Nebraska Booklet
Hand Plant Order Form
Trees will be available for the 2012 spring planting season and we will supply you with the information as soon as possible.
Conservation Trees for Nebraska Booklet
Hand Plant Order Form
Chemigation
Chemigation Application Form
Chemigation form in PDF format. This is an Adobe product. You will view the form, print the form, then mail the form and payment to Lower Niobrara NRD.
General Information Equipment Requirements Chemigation Permits
Reporting Accidents
An actual or suspected accident, relating to the use of chemigation, must be reported within 24 hours of its discovery.
Notification should be made by telephone during normal working hours to:
Nebraska Department of Environmental Quality
(402)471-2186
or the
Lower Niobrara Natural Resources District
(402)775-2343.
After hours or on weekends and holidays, notification should be made to the Nebraska State Patrol.~
Notification should include (if known) the time of occurrence, quantity and type of material, location, and any corrective or cleanup actions presently being taken.
Chemigation form in PDF format. This is an Adobe product. You will view the form, print the form, then mail the form and payment to Lower Niobrara NRD.
General Information Equipment Requirements Chemigation Permits
Reporting Accidents
An actual or suspected accident, relating to the use of chemigation, must be reported within 24 hours of its discovery.
Notification should be made by telephone during normal working hours to:
Nebraska Department of Environmental Quality
(402)471-2186
or the
Lower Niobrara Natural Resources District
(402)775-2343.
After hours or on weekends and holidays, notification should be made to the Nebraska State Patrol.~
Notification should include (if known) the time of occurrence, quantity and type of material, location, and any corrective or cleanup actions presently being taken.
Well Permit
Water Quality
Automatic Rain Gauge Shut Off
Cost Share: 65%
Max of $135 per shut off
Max of $675/cooperator/yr
Requirements:
Max of $135 per shut off
Max of $675/cooperator/yr
Requirements:
- Coordinate purchase and installation of an automatic rain gauge shut off
- Submit a copy of the receipt for the purchase of the shut off to the District
Automatic Drip Oiler
Cost Share: 65%
Max of $130 per oiler
Max of $650/cooperator/yr
Requirements:
Max of $130 per oiler
Max of $650/cooperator/yr
Requirements:
- Coordinate purchase and installation of a drip oiler
- Submit a copy of the receipt for the purchase of the drip oiler (including 4-gallon poly tank) to the District
Domestic Well
Cost Share: 65%
Max/cooperator
$800 new well
$500 Rural Water System Hookup
$800 treatment
Requirements:
Max/cooperator
$800 new well
$500 Rural Water System Hookup
$800 treatment
Requirements:
- NRD must sample well to verify nitrate level exceeds the MCL of 10 ppm
- Well must be sole source of water for the residence
- Cooperator must agree to provide water to occupied residence for 10 years or refund part of cost share
- Coordinate all approved construction
- Provide the District with a copy of construction cost
- Abandon or cap all unused wells
Nitrogen Management
Nitrogen Management Form
Cost Share: 75% actual cost
Max of $1.50 per acre
Max of $200/cooperator/yr
Requirements:
Guidelines:
Cost Share: 75% actual cost
Max of $1.50 per acre
Max of $200/cooperator/yr
Requirements:
- Sign up period: Sept 1 - May 1
- Prefer 3 ft. depth samples (2 ft acceptable)
- Sample irrigation water (1 sample per well)
- Cooperator can do their own sampling
- Arrange for professional analysis of samples
- Submit copies of the results and billings to the District
- Submit completed Annual Crop Report Form to the District following harvest
Guidelines:
- One composite sample per 40 acres
- Combine 10 – 15 individual samples for 0-8” composite, 6-8 individual samples for 8-24” and 24-36” composites
- Sample at three depths: 0-8 “, 8-24”, and 24-36”
Livestock Manure Analysis
Livestock Manure Analysis Program Form
Cost Share: 65%
Max $200/cooperator/yr
Requirements:
Cost Share: 65%
Max $200/cooperator/yr
Requirements:
- Livestock waste must be applied to land used for crop or grass production within the LNNRD
- A certified laboratory must analyze all samples
- Analysis must include ammonium-nitrogen, organic-nitrogen, and total phosphorus
- Collect representative samples as close as possible to the time of application
- Collect samples before each application
- Collect and preserve samples according to laboratory recommendations
- Submit a copy of all shipping and analysis expenses and lab results to the District
- Apply manure based on sound agronomic principals
Water Testing
- The LNNRD will test water samples free of charge for nitrate-nitrogen. Water samples can be brought to the office in Butte or arrangements can be made to have a sample taken.
Ultrasonic Flowmeter
- Irrigators interested in measuring the volume of water applied through their system can call the office. The Lower Niobrara NRD has an ultrasonic flow meter to measure flows. There is a $50 charge for this service.
Well Abandonment
Well Abandonment Form
Cost Share: 65% of materials and labor
Max of $500 per well
Max of $1,500/cooperator/yr
Max cost share based on well dimensions as shown in chart below
Requirements:
Cost Share: 65% of materials and labor
Max of $500 per well
Max of $1,500/cooperator/yr
Max cost share based on well dimensions as shown in chart below
Requirements:
- Cooperator is responsible for removal of obstructions (pipe, concrete, towers, etc.) at own expense.
- A licensed well driller or pump installer must seal the well.
- Submit application to the District for approval at the next monthly meeting of the Board of Directors.
- Cooperator shall notify the District before work begins.
- NRD can observe the sealing.
- Cooperator shall submit copy of bills to the District for payment.
